No | Nama Peserta | K | B | A | T | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Takasima Jaya - 02.858.806.9-951.000 | Rp. 5.353.251.468,34 |
Rp. 5.353.251.468,34 |
Rp. 5.353.251.468,34 | ||||||||
2 | CV.WARMARE INDAH - 85.363.864.1-955.000 | Rp. 5.437.849.364,51 |
Rp. 5.437.849.364,51 |
Tidak menyampaikan metode pelaksanaan pekerjaan. tidak menyampaikan jadwal jangka waktu pelaksanaan pekerjaan, tidak menyampaikan dokumen rencana keselamatan konstruksi (RKK) | ||||||||
3 | CV. Intsia Pratama - 02.138.599.2-955.000 | |
|
|||||||||
4 | EVAN STAR, CV - 31.288.848.0-955.000 | |
|
|||||||||
5 | BANULA MANDIRI, CV - 03.004.993.6-955.000 | |
|
|||||||||
6 | PT. BANGUN UTAMA NUSANTARA - 02.967.292.0-955.000 | |
|
|||||||||
7 | PT. GUNUNG LOKON - 31.360.951.3-955.000 | |
|
|||||||||
8 | CV.SAN SURYA - 02.658.806.1-952.000 | |
|
|||||||||
9 | CV.KASIH - 02.923.267.5-955.000 | |
|
|||||||||
10 | PT. TUNAS PAPUA JAYA - 02.316.577.2-951.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak